Call WhatsApp Free quote
Hamilton, Halton, Peel & Niagara

Kitchen renovation in Hamilton and Halton

Layout, cabinetry, counters, tile and finishes, planned to a written schedule so the kitchen is back in use on the date we promised.

Get a free quote Call (437) 332-3023
Free written quotes$2M liability + WSIB1-year workmanship warrantyLed by a civil engineer
The short answer

A kitchen renovation in Hamilton typically costs about $30,000 to $90,000, depending on layout changes, cabinetry and counter selections, and what is behind the walls. Jopie plans the whole job, including demolition, mechanical, drywall, tile and paint, to a written schedule.

Updated October 25, 2026

The kitchen is the room that gets used hardest and judged fastest. Jopie Construction Group manages full kitchen renovations across Hamilton, Halton, Peel and Niagara — layout, cabinetry, electrical and plumbing coordination, and finishes — as one project, not a string of separate trades.

Completed kitchen renovation in Hamilton showing fridge, cabinetry, quartz island and full room views Kitchen sink, window and cabinetry in a completed Hamilton kitchen renovation

What's included

Full & partial kitchen remodels

From a cabinet-and-counter refresh to a complete gut renovation.

Layout reconfiguration

Opening up walls, moving islands, rethinking the flow of the room.

Cabinetry & countertop coordination

We coordinate suppliers and installation so nothing sits waiting.

Electrical & plumbing relocation

Moving sinks, outlets and lighting where your new layout needs them.

Backsplash & tile

Clean, straight tile work that ties the whole room together.

Flooring integration

Kitchen flooring installed and transitioned properly to adjoining rooms.

What determines the cost of a kitchen renovation in Hamilton?

The same footprint can land at $30,000 or $90,000. These variables explain why:

Layout

Keeping the sink and range where they are is cheapest. Moving plumbing, gas or a wall adds trades, permits and structural work.

Cabinetry

Stock, semi-custom and custom cabinets differ by multiples. Custom lead times often set the whole schedule.

Counters and backsplash

Quartz, natural stone and large-format porcelain price differently per square foot and per fabrication cut-out.

Mechanical and electrical

New circuits for induction ranges, panel upgrades, range-hood venting, under-cabinet lighting and relocated plumbing.

Structure

Opening a wall to the dining room usually means a beam and engineered drawings in older Hamilton homes.

Flooring and ceilings

Levelling old subfloors, removing popcorn ceilings (test for asbestos first) and matching existing floors.

How we work

Design & scope

We walk through your goals, layout options and budget, then quote it in writing.

Demo & rough-in

Old kitchen out, plumbing and electrical relocated where the new layout needs it.

Cabinets, counters & tile

Cabinetry installed, counters templated and set, backsplash tiled.

Finishing & walkthrough

Fixtures, hardware, final details, and a walkthrough before we call it done.

From kitchen to whole-home

Kitchens often open the door to bigger work: removing a wall, upgrading the panel, finishing the basement or renovating the bathrooms in the same push. Because we self-perform drywall, tile and paint, adding a second room is cheaper than starting a second project later.

Want a number for your project?

Send a few details and we reply within one business day with next steps and a walkthrough time.

Get a free quote or call (437) 332-3023

Why Jopie

A kitchen renovation touches almost every trade at once — that's exactly the coordination problem professional project management solves. We keep the sequence tight so cabinets aren't waiting on electrical that's waiting on drywall.

Common questions

Questions homeowners and owners ask

What determines the cost of a kitchen renovation in Hamilton?

Six variables set the number:

  • Layout: moving plumbing, gas or walls.
  • Cabinetry: stock, semi-custom or custom.
  • Counters and tile: material and fabrication.
  • Mechanical: circuits, venting, panel capacity.
  • Structure: beams for open-concept changes.
  • Condition: floors, ceilings and hidden damage.
How long does a kitchen renovation take?

Most kitchens take four to eight weeks on site once cabinets arrive. Custom cabinetry typically adds six to twelve weeks of lead time before that, so ordering early matters.

Can I still use my kitchen during the renovation?

Not the kitchen itself. We set up a temporary sink and cooking station elsewhere and protect adjoining rooms with dust barriers.

Do you install cabinets we have already ordered?

Yes. We check the drawings against the site before demolition so the layout and appliance specs fit.

Do I need a permit for a kitchen renovation in Hamilton?

Cosmetic replacement usually does not. Structural changes, new gas lines, and significant plumbing or electrical changes do. We confirm at the walkthrough and handle applications through the City of Hamilton.

Where we work

Based in Hamilton. Working close to home.

Our home base is Macnab Street in Hamilton, and our residential work is concentrated in Hamilton, Halton, Peel and Niagara, where our crew can be on site every day. Not sure we cover your address? Call or send the quote form and we will tell you. Commercial fit-outs and project management extend across the wider GTA: see GTA commercial work.

Free quote

Tell us about your project.

Send a few details and we reply within one business day with next steps. Prefer to talk? Call or message us now.

  1. Within a dayWe reply by phone or email to confirm your project and book a walkthrough.
  2. WalkthroughWe visit the site, talk through your goals and take measurements.
  3. Written quoteA clear scope, price and schedule in writing. No pressure, no obligation.
(437) 332-3023 info@jopieconstruction.ca 181 Macnab St S, Hamilton, ON L8P 3C7
Mon–Fri 8–6 · Sat–Sun 9–5

We use your details only to reply about your project. See our privacy policy.